Procurement Metric
Sum of all expenses associated with the purchase and logistics required to bring a raw material into a manufacturing facility represents the true price of the commodity. Total landed cost accounts for the purchase price at the mill and adds every subsequent charge until the pallets reach the warehouse floor. This figure provides a more accurate basis for comparison than the simple list price.
Cost Component
Transportation fees, import duties, insurance, and handling charges at the port comprise the major additions to the base rate. Within the calculation of total landed cost, the expense of quality inspections and the risk of currency fluctuations are also factored into the final number. If a shipment is delayed, the cost of holding safety stock or the penalty for a missed production window is added to the burden.
These variables change based on the geography of the supply chain and the specific terms of the commercial agreement. By capturing the full scope of expenditure, the metric prevents the hidden losses associated with low price sourcing from distant regions.
Logistics Decision
Sourcing decisions based on this value often favor local suppliers over cheaper international options with higher logistics overheads. Total landed cost remains the standard for evaluating the feasibility of new fibre sources in a global market.